less than two weeks
Nov. 5th, 2011 08:39 amHalloween's been over for days and I still haven't gotten much done. It's not quite the last minute yet, but perhaps the penultimate minute?
I did start the last border of the sister-in-law scarf; I told myself I would have to start it on the first of November, no matter how long the body was. So I did. It's about 1/3 done and the scarf will be about 36" before blocking, which I think I can stretch to at least 60" during blocking. It is garter-stitch lace after all.
I've never knitted a join-as-you-go project before. It's weird but fun. The tidiness appeals to me. Plus I hate grafting; this is better.
I haven't done any more on the caraco since the last photo I posted; I had a few shifts at work this week, and I have work today, but I'm planning on tomorrow being a sewing day, and I had better finish the whole darn thing. F's costume will probably be done the easiest way I can, and totally machine-sewn, but it's kid clothes, so I don't mind that so much. If it gets to be crunch time, the small person might get an extra cartoon so I can sew.
I'm getting excited for our trip!